Selected work
TMPzero
Planning infrastructure for electric aviation. A Tampere airport Digital Twin bringing renewable-energy infrastructure, solar analysis, and electrical simulation into a shared 3D environment.
Software development / Simulation
Sitowise / City of Tampere
2022–2023

TMPzero renewable-energy infrastructure and solar-panel analysis.
1 / 2The challenge
A problem in context.
Planning infrastructure for electric aircraft operations requires understanding energy needs alongside the physical airport environment. The project connected infrastructure visualization with solar and electrical analysis.
My contribution
What I brought to it.
- Contributed to the development of a Tampere airport Digital Twin for electric aircraft infrastructure planning.
- Ported solar-analysis code from MATLAB to C#.
- Developed an electrical simulation and analysis module.
Engineering decisions
Behind the experience.
Solar analysis inside the application
Ported MATLAB solar-analysis code to C#, bringing the calculations into the Unity application alongside the infrastructure visualization.
Infrastructure and simulation in context
Developed an electrical simulation and analysis module as part of the Digital Twin to support planning for electric aircraft operations.
Delivered capabilities
The result.
Delivered solar-analysis and electrical simulation capabilities within an airport Digital Twin supporting infrastructure planning for electric aviation.